Saudi Arabia will implement a slew of power projects at Tabuk region with a total cost of SAR 1.6 billion in 2018.
The projects include a SAR 200 million switching station in eastern Tabuk, which is due to start operations in 2021; an overhead 380KV-power line in the western region for a total cost of SAR 170 million; a switching station II at 380/133/33 KV at a total cost of SAR 900 million, besides SAR 350 million distribution networks.
The projects were included in an internal government communication disclosed to local media.
Be the first to comment
Comments Analysis: