Maaden takes action to minimize impact of project halt

27/11/2012 Argaam

The Saudi Arabian Mining Company (Ma'aden) would like to clarify about the halt of the contractor assigned by the Saline Water Conversion Corporation (SWCC) for the implementation of the electricity plant project at Ras Al Khair. The project halt may cause shortage in the supply of electricity required by the Ma'aden Aluminum Company (MAC) at Ras Al Khair. 
Ma'aden has taken prior action to minimize the impact of the contractors halt on the timely implementation of the project by agreeing to supply electricity with the Saudi Electricity Company(SEC). Ma'aden, SEC and SWCC have been continuous coordinating relevant action steps. 
The impact on the project will lead to a slowdown in scheduled ramp up to reach the designed capacity of the aluminum smelter. 

Comments {{getCommentCount()}}

Be the first to comment

loader Train
Sorry: the validity period has ended to comment on this news
Opinions expressed in the comments section do not reflect the views of Argaam. Abusive comments of any kind will be removed. Political or religious commentary will not be tolerated.