General Authority of Civil Aviation (GACA) has inked a contract with a consultancy firm to map out the designs of the new Abha International Airport, GACA said on its Twitter account.
“The designs will likely take 12 months to be finalized,” GACA added.
Elsewhere, Abdul Hadi Al Mansouri, GACA head said the new designs will be integrated into the area structure.
Be the first to comment
Comments Analysis: