USD Riyal

Project Monitor

Date Projects Country Cost (Million) Status More
01/05/2023 Steel Plate Manufacturing Complex Saudi Arabia Announced
02/03/2023 Clean Hydrogen Project Saudi Arabia Under Study
13/12/2022 Fai Sedra (2) Residential Project Saudi Arabia 972.00 Under Study
20/06/2022 Shuaibah 3 Independent Water Project (IWP) Saudi Arabia 3100.00 Under Construction
29/03/2022 Bus Manufacturing Plant Saudi Arabia Under Construction
29/03/2022 Chemicals Plant Saudi Arabia Completed
18/01/2022 Forging and Casting Facility-Ras Al-Khair Saudi Arabia 3130.00 Under Construction
18/01/2022 Green Hydrogen Production Project Saudi Arabia Under Study
08/09/2021 Seamless Steel Tubes Facility Saudi Arabia 1012.50 Announced
24/10/2017 Neom Saudi Arabia 1875000.00 Under Construction
13/07/2017 The Red Sea Saudi Arabia Completed
05/07/2017 Engines and Pumps Project Saudi Arabia 1500.00 Under Construction
15/07/2007 SHUAIBAH EXPANSION IWP Saudi Arabia 873.75 Completed
05/11/2005 Shuaibah IWPP (SWEC) Saudi Arabia 9187.50 Completed